Cashco PBE Pressure Build Economizer Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Capteurs Cashco PBE Pressure Build Economizer. Cashco PBE Pressure Build Economizer User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 8
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
MODEL PBE
PRESSURE BUILD /
ECONOMIZER REGULATOR
SECTION I
Model PBE is a pressure reducing regulator used to control pressure in gas storage tanks. Available in bronze
construction with brass and stainless steel trim, 1/4"(DN8) FNPT connections. Suitable for liquid and gaseous
service. Refer to Tech ni cal Bul le tin PBE-TB for speci c design conditions and selection rec om men da tions.
I. DESCRIPTION AND SCOPE
II. INSTALLATION
SECTION II
INSTALLATION, OPERATION & MAINTENANCE MANUAL (IOM)
IOM-PBE
12-13
1. An inlet block valve should always be installed.
2. If service application is continuous such that
shut down is not readily accomplished, it is rec-
ommended that an inlet block valve, outlet block
valve, and a manual bypass valve be installed.
3. Pipe unions should be installed to allow removal
from piping.
4. An outlet pressure gauge should be located ap-
proxi mately ten pipe diameters downstream, and
within sight.
5. All installations should include a downstream
safety re lief de vice if the inlet pressure could
exceed the pres sure rating of any downstream
equip ment or the maximum outlet pressure rating
of the unit.
6. Clean pip ing of all foreign material including chips,
welding scale, oil, grease and dirt before installing
the reg u la tor. Strainers are rec om mend ed.
7. In plac ing thread seal ant on pipe ends pri or to
en gage ment, ensure that excess material is re-
moved and not allowed to enter regulator upon
startup.
8. Flow Direction: Install so the ow direction match-
es the arrow cast on the main regulator body.
9. For best performance, install in well drained hori-
zon tal pipe.
10. Recommended installation is with spring cham-
ber hanging directly be low the body in a ver ti cal
down wards orientation. Allows water to drain; etc.
11. Regulators are not to be buried un der ground.
12. For insulated piping systems, recommendation is
to not insulate regulator.
CAUTION
Installation of adequate overpressure pro tec tion is recom-
mended to pro tect the reg u la tor from overpressure and
all down stream equip ment from damage in the event of
regulator failure.
with Economizer Relief Connection on backside
Vue de la page 0
1 2 3 4 5 6 7 8

Résumé du contenu

Page 1 - MODEL PBE

MODEL PBEPRESSURE BUILD /ECONOMIZER REGULATORSECTION IModel PBE is a pressure reducing regulator used to control pressure in gas storage tanks. Avail

Page 2

IOM-PBE2III. PRINCIPLE OF OPERATION1. Movement occurs as pressure variations regis-ter on the diaphragm. The registering pressure is the outlet, P2,

Page 3 - SECTION VI

IOM-PBE3A. General:1. Maintenance procedures hereinafter are based upon re mov al of the regulator unit from the pipeline where in stalled.2. Owner

Page 4

IOM-PBE44. Rotate body cap (16) CCW to remove from body.5. Remove piston spring (18), piston assembly (17) and u-cup seal (22). Inspect TFE seat-in

Page 5 - SECTION VII

IOM-PBE52. Regulator can't pass suffi cient fl ow.VII. TROUBLE SHOOTING GUIDE1. Erratic operation; chattering.SECTION VIIPossible Causes Remedie

Page 6 - CAUTION

IOM-PBE6SECTION VIIINEW REPLACEMENT UNIT:Contact your local Cashco, Inc., Sales Rep re sen ta- tive with the Serial Number and Product code. With thi

Page 7 - Figure 1

IOM-PBE7Figure 1 Repair Parts Item No. Description Kit B 1 Body 2 Spring Chamber 3 Adjusting Screw 4 Locknut 5 Spring Button 6 Range Sp

Page 8

Cashco, Inc.P.O. Box 6 Ellsworth, KS 67439-0006PH (785) 472-4461Fax. # (785) 472-3539www.cashco.comemail: [email protected] in U.S.A. IOM-PBEC

Commentaires sur ces manuels

Pas de commentaire